Home >

Repair And Repair Contract

2009/5/14 15:41:00 42072

The author is: the first, the second and the third.

The Contractor: he is in charge.
   
First, repair and repair items.

Project content reward

Total RMB amount (capital)

Second materials, material, name, trademark, manufacturer, specification, type, unit of measurement, quantity, quality, provider, date, material, cost, unit price.

Total RMB amount (capital)

The inspection standard, method, time and place of third materials and the time limit for objection: fourth repairs and repairs from the time of repair, repair, repair, repair, repair, repair, repair, and maintenance from time to time.

Fifth technical standards and quality requirements for repair and repair projects: sixth, the time, method and confidentiality requirements of the sixth parties to provide technical information and drawings: seventh, the contractor has found that the drawings and technical requirements of the ordering party are unreasonable. The ordering party shall reply within days after receipt of written objection.

第八条定作人(是/否)允许第三人成修缮修理项目的主要工作;可以交由第三人完成的工作是:________.第九条定作人协助承揽人的事项与要求:_____________第十条修缮修理项目交付的时间、方式及地点:__________________第十一条修缮修理项目验收标准、方法及时间:__________________第十二条定作人应在__________年______日______前向承揽人(预付材料费/交付定金)(大写)_______________元。

Thirteenth terms of settlement and time limit: fourteenth guarantee period: fifteenth, the conditions for rescission of this Contract: (1) the ordering party may terminate the contract at any time, but it should notify the contractor and bear the losses caused to the contractor. (two)

The sixteenth is the liability for breach of contract: the calculation method of liquidated damages or loss compensation for the Seventeenth Party Contract Disputes: the settlement of disputes arising from this contract shall be settled through consultation between the two parties, and the dispute can be submitted to the Suzhou Arbitration Commission for arbitration.

The eighteenth other agreed items are: 1.

Residence of the ordering person: Postal Code: the place of the receiver: Postal Code:
   
Legal representative: legal representative:

Principal agent: principal agent:
   
Tel: Fax: Telephone: Fax:

  • Related reading

Equipment Repair Contract

Contract template
|
2009/5/12 14:20:00
42037

Market Place Lease Contract

Contract template
|
2009/5/8 14:18:00
42027

Application For Pportation Change

Contract template
|
2009/5/5 15:26:00
42033

Contract Of Foreign Exchange Loans For Working Capital

Contract template
|
2009/5/3 14:51:00
42050

Equipment Repair Contract

Contract template
|
2009/4/29 14:33:00
42053
Read the next article

Handling Methods Of Social Insurance Administrative Disputes

Article 1 in order to properly handle social insurance administrative disputes, safeguard the legitimate rights and interests of citizens, legal persons and other organizations, and safeguard and supervise social insurance agencies (hereinafter referred to as agencies) to exercise their functions and powers according to law, these measures are formulated in accordance with the labor law, administrative reconsideration law, relevant laws and administrative law regulations. The second social insur